How Long Does A Kitchen Remodel Take? Top Full Guide 2022

How Long Does A Kitchen Remodel Take Top Full Guide 2022

Remodeling a kitchen can be a daunting task. It is essential to plan and know how long does a kitchen remodel take. Remodeling requires careful planning, as it is time-consuming.

It would help if you had a good estimate time of the project to work around your other commitments and the various stages of the project itself. Many of your decisions during the kitchen design phase will be based on this initial figure.

Kitchen Remodeling Timeline

A typical US kitchen remodel takes between 6-8 weeks if you hire a reliable contractor who has extensive experience in building, plumbing, and electrical remodeling.

You might expect the kitchen remodel to take longer if you do it yourself or hire a less skilled contractor.

Kitchen Remodeling Timeline

These are some general guidelines regarding the timeline.

  • A typical kitchen remodels in the United States takes between 6 and 8 weeks.
  • Kitchen remodels that are more complex or large may take between 10-12 weeks.
  • Larger kitchen remodels can take longer and may take up to 3-5 months.

The kitchen is the most complex part of your home. It requires extensive electrical wiring, plumbing, and new appliances.

You will need to replace more of these design elements in your existing kitchen remodel.

It can be nerve-racking.

You should be prepared for large kitchen remodeling projects.

Why Are Kitchen Remodels So Time-Consuming?

Because so many things need to be changed in such a short time, kitchen installation can take so much time. The rest of your home’s rooms have only three basic needs: heat, electricity, and four walls. They are both predictable and quick to meet their needs.

It is not like a kitchen.

A kitchen needs heating, plumbing, extensive wiring, sturdy cabinets, durable flooring, suitable granite countertops, all appliances (ovens and microwaves), and must be designed to be used efficiently.

Before starting the home renovation, you must first demolish and prepare your kitchen. This is particularly important if you are changing the layout of your sinks or ovens. To make the kitchen renovation project work, it will be necessary to overhaul the electrics and plumbing system completely.

Installation of a kitchen is much longer and more susceptible to change.

Why Are Kitchen Remodels So Time-Consuming

We recommend that you allow for three to four months for your kitchen renovation after closing on your apartment. This will depend on the complexity of the space and the project’s scope.

If you don’t alter the footprint of electrical renovation or extensive plumbing and use stock cabinets and built-in appliances, your renovation should take a few weeks. However, moving your kitchen from one area of your house to the other will require both city permits and board approvals. If you use custom cabinets, it may take several months.

The wide range of possible outcomes is due to multiple moving parts and multiple parties. Some aspects are out of your control. Sweeten is a free service that matches homeowners with qualified general contractors. It breaks down each step of a kitchen remodel.

PRE-CONSTRUCTION PHASE

Although the focus is often on the visible phase of construction, many things need to be done before picking up the sledgehammer. These are the details that must be completed before you can break ground on your kitchen remodeling project.

STEP 1: Close on your home (1-3 months).

Some homeowners may already be homeowners, but many are under contract or ready to close when they start the process of renovating. It is best to wait until the property has been closed and keys are in your hands before you start any renovations. You should wait until you have signed the contract, even if you are in a rush to begin the design process.

STEP 2 – Post your project within 1-3 days

First, post your kitchen renovation project on Sweeten to start soliciting bids. Sweeten will allow you to add details about your space and photos of inspiration (optional but helpful for us in finding an experienced contractor who has done similar style renovations), as well as any other information that could help Sweeten match you up with the right contractors.

Within three days, you will receive 3-5 games, along with links to view contractors’ profiles online. This is your chance to look at past projects and review them to determine if they are a good match.

PRE-CONSTRUCTION PHASE

STEP 3: Schedule site visits, solicit bids (1-3 Weeks)

After looking at the profiles of Sweeten contractors, you can decide which one you would like to meet. A contractor can understand the scope of the project and the limitations and opportunities within the space. It’s also a great way to meet the other side and see if they can get along.

Check out our blog post on how to prepare for your meeting after you have scheduled your visit. Within 5-7 business days of your visit, you can expect a written proposal.

STEP 4 – Level bids and select a contractor (1-2 Weeks)

It’s time for you to compare and contrast the written bids. This guide on leveling bids may be helpful. You can also ask any follow-up questions. Sweeten can also help you navigate the different requests and give feedback on the selection.

STEP 5: Sign a construction contract and complete the construction schedule (1 Week).

After you have selected a contractor, they will prepare a contract to review. This contract will usually include a description and cost estimate, along with the payment schedule.

how long does it take to remodel a kitchen

STEP 6 – Obtain permits or approvals (ranges vary)

This is the most crucial step that could lead to delays or hiccups. Although obtaining the proper permits and approvals has been a problem for many renovations, don’t worry. Our expert contractors are familiar with these processes and can often advise you on the best way to accomplish your goals.

You will need additional DOB permits and an architect to move gas or plumbing lines. Some Sweeten residents have reported that they could get approvals within two weeks, but it is more common to take several months.

You don’t have to worry about getting approval from the building board if you live in an independent house. However, you will still need to get permits from the city for any plumbing or electrical work.

STEP 7: Source materials (ranges)

You are responsible for ordering all or part of the materials you need to complete your renovation. Some items take a long time to arrive, so don’t let one faucet stop your entire renovation. You can look at the currently available stock and be ready for shipment if time is an issue. Talk to your contractor about when the product will be delivered to coincide with installation time.

STEP 8: Let your neighbors know that you are renovating (15 minutes).

Be a good neighbor by letting your neighbors know that renovations are imminent. Let them know what they can expect and how long it will take. It’s easier to accept disruptions when you see the end is near. You can bring some treats, wine, or gift cards for local coffee shops. Invite them over after the reno is done!

CONSTRUCTION PHASE

Noting: Although most of the steps in Construction fall under your contractor’s control, it is essential to know what should happen when. You will be responsible for paying your contractor as per your contract.

Also, it would help if you kept your schedule open for several hours each week to answer any questions regarding details or changes that may arise during construction.

STEP 9: It’s demo time (1-2 days)

Move on from the old kitchen! Once you have completed all paperwork, it is time for your contractor to get out the sledgehammer. Ensure that items you are keeping are covered with plastic or tarp while the crew takes apart everything else. This will depend on the size of your kitchen and the extent of the renovation. It shouldn’t take longer than two days.

STEP 10: Reroute electrical and plumbing (1-4 days).

Once you have stripped the space to the studs, installing new plumbing or electrical will be simple. Now that you have a clear view of the wall consider whether or not any plans should be changed.

STEP 11: Sign-offs and city inspections (1 hour on-site).

You may require city permits if you need them. You can find out more about electrical and plumbing permits from the city here. Although the inspection may only take an hour to complete his work, scheduling an appointment can take several days or even weeks.

A master plumber can sign off on water line pipework if a city inspector is absent. However, an inspector must inspect and approve any gas line work. Before the inspection takes place, you are not permitted to close the walls or move on to the next phase.

CONSTRUCTION PHASE

Notice: In the case of electrical work, an inspector is usually scheduled to visit once the project design has been 100 percent completed. They will inspect the electrical panel, junction boxes, and electrical outlets.

Sometimes your inspection can be rescheduled twice or three times due to delays and bureaucracy in the city. This should be discussed with your contractor and architect.

STEP 12: Installation – floors (1-5 days)

If you plan to reconfigure your cabinets later, ensure that the flooring is uniform throughout the space.

STEP 13: Installation – All other materials, including cabinets and appliances (1-4 days).

All other materials are usually installed in the following order: cabinets and appliances, fixtures, lighting, counters and backsplash, cabinet hardware, and institutions and lighting. Depending on the site conditions and the arrival time, aspects of this order may differ.

There are great ideas for accessories kitchen counter, follow the link to see more.

STEP 14: Clean up (1 day).

Contracts typically allow for the space to be left broom-swept. You may need to hire post-construction cleaning professionals to ensure that your new flooring is safe for eating.

POST-CONSTRUCTION POLE

STEP 15: Final walkthrough with the contractor (30-60 minutes).

Discuss the project with your contractor. Check out all drawers and doors, examine the edges and finishes, then verify that everything is functioning as it should. Make sure to point out any issues and add them to the punch list. If it is minor, the contractor will fix it right away or schedule another time for you to return.

Jean Brownhill, Sweeten’s founder and CEO suggests that you keep notepads in every space. You should not talk to your contractor for at least two weeks but take notes as you move into your new home.

STEP 16: Items for the Punch List (1-10 Days)

Depending on the item, it could take from one day to several weeks. It’s usually because items are back-ordered that it takes longer. Your contractor should return to fix the problem within a few days.

how long does it take to completely remodel a kitchen

STEP 17: Final payment (10 minutes).

You have been paying installments during the renovation. Now it is time to pay your contractor the remainder and say goodbye.

This timeline will give you an overview of the different aspects of renovation and provide a guideline for how long each step should take. It also takes into consideration factors outside your control.

According to Sweeten’s estimates, kitchen renovations take anywhere from three to two months, depending on their complexity. It is essential to identify the obstacles that might hinder your progress and give yourself more time to complete them.

This is a cost for painting the cabinet you can refer for kitchen renovation.

FAQs

How long does it take to remodel a kitchen?

It is not necessary to do any customization or construction. A replacement kitchen project takes 6-8 weeks for a medium-sized kitchen. Remodeling kitchens that require a larger space or structural changes and reconfiguration of the floor plan can take longer. It is reasonable to expect a turnaround time of 10-12 weeks.

how long does a full kitchen remodel take

Is it possible to remodel a kitchen by completing the steps in stages?

It can be more cost-effective to complete a significant kitchen remodel in stages. You can address each phase separately and take as much time as you need to complete the project. This helps reduce stress and allows you to move on to the next stage as your budget allows.

Do you prefer to install flooring or cabinets first?

It is best to install flooring for most hardwood floors before you have cabinets. It’s much easier to install hardwood floors before cabinets. Professionals will install your feet, so you don’t have to worry about damaging them.

Why is cabinet installation so expensive?

Labor. Labor is a significant reason kitchen cabinets cost more because you are often hit from multiple angles. The labor cost for installing the cabinets, delivery will be included. … is due to the high cost of skilled labor.

Video

Conclusion

When remodeling a kitchen, many decisions need to be made. For example, in your initial design phase, you will be making decisions about your new kitchen layout. You will need to decide where you want the refrigerator, countertop, and cooking area. You will also need to install appliances that are compatible with your needs. You’ll have to find alternative food and cooking arrangements

The key to remodeling is to plan and make sure that you have all the necessary tools for the job. Making the right choices during the design phase will ensure that you get the new kitchen of your dreams. This article is intended to be a helpful guide for those thinking about remodeling their kitchen.